Check the system and parts
Share furniture models, quantities, drawings, and manufacturer instructions. Missing fixings or incompatible components are identified before an assembly date is confirmed.
We deliver, assemble, and place commercial furniture for workplace moves and office reconfigurations.
Service availability depends on the location, route, dates, and handling requirements. Storage, installation, specialist work, and remote or northern transport are confirmed in your proposal.
Scope a furniture installation ↗
We review your furniture systems, quantities, and floor plan, then deliver, assemble, and position the agreed pieces. We check the completed layout with you and record any outstanding items in the final walkthrough.
Electrical connections, wall fixing, structural alterations, and manufacturer-specific work require a separately agreed scope with qualified specialists. Product compatibility, missing parts, and warranty requirements are assessed before assembly.
Share furniture models, quantities, drawings, and manufacturer instructions. Missing fixings or incompatible components are identified before an assembly date is confirmed.
Group components by destination area and leave a workable assembly space. The agreed desks, tables, storage, and seating are assembled and positioned to the layout.
Check furniture placement and record outstanding components or adjustments. Separately scoped electrical, structural, or specialist fixing work remains with the appointed trades.
Provide product details, quantities, condition, and the proposed floor plan. Reuse depends on fit, available parts, manufacturer requirements, and the installation scope. Technical or building works are reviewed separately.
Identify known shortages when sharing the furniture schedule. We can record affected workstations and discuss the assembly sequence, but compatible replacement parts and manufacturer requirements must be resolved before those pieces can be completed.
Select the installation municipality and prepare the furniture schedule. Site access, assembly space, and the approved layout shape the installation sequence.
Tell us the furniture systems, quantities, delivery status, and target installation date. Note whether you need disassembly, reassembly, new furniture assembly, or a combination.

Product details, available parts, and the approved layout help us identify assembly dependencies.