Reconcile the asset list
Match the agreed equipment to destination labels and receiving contacts. Record handling requirements before selecting protective packing and transit arrangements.
We pack and transport workstations, servers, and network equipment around your IT team’s approved change window.
Service availability depends on the location, route, dates, and handling requirements. Storage, installation, specialist work, and remote or northern transport are confirmed in your proposal.
Plan IT equipment transport ↗
We inventory and label each asset, prepare protective packing, and move the agreed equipment in the required sequence. Our physical move follows your technical team’s shutdown, backup, reconnection, and validation plan.
Technical disconnection, data backup, reconnection, and testing are handled by your IT team or separately appointed specialists. Transport arrangements and handling requirements are confirmed during scoping.
Match the agreed equipment to destination labels and receiving contacts. Record handling requirements before selecting protective packing and transit arrangements.
Your technical team releases the equipment after its shutdown procedures. Müve packs and transports the agreed assets in the sequence needed at the destination.
The receiving contact checks the delivered assets against the inventory. Your IT team takes over reconnection and functional checks, with any transport exceptions recorded.
Your IT team or qualified technical specialist handles backups, disconnection, reconnection, and testing. Müve handles the agreed packing and physical move around their approved change window, with clear asset labels and documented handover.
Yes, the proposed sequence can distinguish infrastructure, shared devices, and user workstations. Your IT team should specify receiving priorities and readiness conditions so packing and loading can follow that order.
Select a site location, then identify the equipment owner and receiving team. Physical transport should fit the technical change window for both ends of the move.
Provide equipment types, approximate quantities, rack or case dimensions, and the approved move window. Name the technical contact responsible for shutdown and receiving.

Do not send passwords, credentials, backups, or confidential asset records through this form.